Monitoring and improvement of project solutions for the replacement of under-craned structures of the assembly shop in an industrial building. (2024). Modern Technologies and Methods of Calculations in Construction, 20, 158-170. https://doi.org/10.36910/6775-2410-6208-2023-10(20)-17